Nutakki PHC

The facility exists since 40 years in an area covering 4 acres of land.

Functioning 24 hours caters to a population of 48000 residing in 14 villages around the PHC with 9 sub centres. The First Referral Unit (FRU) is District Hospital, Tenali.

Staff Pattern: 1 Lady Medical Officer, 4 staff Nurses, 14 ANMs, 3 MPHA (Male), 1 PHN, 1 Pharmacist and other class IV workers.

Infrastructure: Currently serves the people in the newly constructed building in 2014 adjacent to the old building which is to be condemned. The facility has OPD strength of around 60 per day, 5 Normal Vaginal Deliveries per month, 1 O.T, 2 OPD rooms, 1 injection room, 1 Delivery room and 1 New Born care corner with warmer, 6 beds with air conditioning, cold chain system, Basic laboratory set up, Quarters for paramedical staff.

Duggirala PHC:

 The facility exists since 6 months (1958 building) in an area of 1-2 acres of land  Functioning between 09:00AM and 04:00PM since 6 months  Staff Pattern: 1 Lady Medical Officer deputed from Emani PHC, 2 staff nurses, 1 Pharmacist, other class IV workers.  Infrastructure: The facility has one OPD room with around 30 patients per day, Basic Laboratory set up (MED-AL), Cold Chain system but no vaccines available due to lack of Inverter, 2 patient cots, basic medications. No MCH services were being provided.  The First Referral Unit (FRU) is District Hospital, Tenali  The facility is opposite the Kommamuru canal, Duggirala

Emani PHC

The facility exists since 1946 in an area of around 2.5 acres of land  Functioning between 09:00AM and 04:00PM, caters to a population of about 45000 residing in 19 villages with 10 sub centres.  This PHC acted as Rural Health Centre (field practice area) for Guntur Medical College Interns who were posted here 1 month as part of their Internship training 20 years back  Staff pattern: 1 Medical Officer, 2 staff nurses, 15 ANMs (Both regular and contract), 1 Pharmacist, MPHAs, Office staff and Class IV workers.

A,Infrastructure: Currently serves the people in the old building (to be condemned). The new building which was recently constructed within the premises is not yet inaugurated. The facility has OPD strength of 60-80 per day, basic laboratory services, Immunization services present. There are separate buildings for a Labour room, Operation Theatre and meeting hall with in the premises which are to be condemned. Currently no delivery services were being provided. Cold chain system present and immunization services are being provided by the PHC.  The First Referral Unit (FRU) is District Hospital, Tenali

3 Comments

Leave a Comment
  1. Avatar
    It will be a good initiative if we could showcase these in the newsletter.

Leave a Reply